North West News
PEEL RIVER TO RUN DRY AS TEMPORARY WEIR IS BUILT
![](https://s33529.pcdn.co/wp-content/uploads/2019/12/frame-Large_1000x563p_thumbnail-65-1.jpg)
The Peel River will soon stop flowing after a new weir was launched in Dungowan today.
It’s first phase of critical drought infrastructure set to extend Tamworth’s water supply to 2021.
text will be replaced